Peak-shaving & demand reduction
Trim peak kVA to cut capacity charges, DUoS red-band exposure and available-capacity fees on your DNO agreement.
From 50 kWh cabinet BESS to multi-megawatt-hour container systems — sized around your tariff, load profile and grid connection. One team from feasibility to O&M.

From feasibility and DNO paperwork through civils, install and commissioning — into long-term O&M and revenue optimisation.
Trim peak kVA to cut capacity charges, DUoS red-band exposure and available-capacity fees on your DNO agreement.
Charge on cheap overnight / green tariffs and discharge across expensive daytime periods — sized to your half-hourly profile.
Islanding, UPS-grade backup and black-start capability for critical loads across manufacturing, data and healthcare sites.
AC- or DC-coupled BESS added to new or existing solar PV to lift self-consumption, defer grid reinforcement and export-limit to G100.
Dynamic Containment, Dynamic Regulation, Balancing Mechanism and Capacity Market — integrated with your chosen optimiser / route-to-market.
Cabinet BESS from ~50 kWh through to multi-MWh containerised systems — Tier-1 cells, liquid cooling and full fire detection / suppression.
Priced against your real half-hourly consumption and tariff — not a spreadsheet guess.
Half-hourly consumption analysis, tariff review, DUoS / Triad and capacity-market modelling to size the BESS around a real business case and payback.
Full electrical, containment and civils design, G99 (import & export) or G100 application, structural / fire-safety sign-off and planning consents where needed.
Foundations, container / cabinet BESS, PCS, transformers, LV/HV switchgear and metering — installed by our own crews and commissioned with witness testing.
Optimiser / EMS configuration, live SoC and revenue monitoring, planned O&M visits, warranty management and 24/7 fault response.
From ~50 kWh cabinet BESS for a workshop or office through to multi-megawatt-hour containerised systems on industrial estates. We regularly deliver 250 kWh–5 MWh projects and coordinate HV connections for larger sites.
Cabinet BESS often falls under permitted development, but larger container systems, restricted sites and any HV connection usually need planning and formal landlord consent. We handle applications, fire strategy and consultee engagement as part of the package.
Peak-shaving and tariff-arbitrage systems typically pay back in 4–7 years; grid-services and solar+storage projects can be quicker depending on route-to-market. We model your half-hourly data and tariff before quoting to give a realistic figure.
Yes — G99 import & export applications and G100 export-limited schemes are submitted and managed on your behalf, along with witness testing, commissioning paperwork and any HV / DNO liaison.
We follow NFPA 855, IEC 62933 and the current UK BESS fire-safety guidance — separation distances, deflagration venting, gas / smoke detection and suppression, along with a site-specific fire strategy signed off before energisation.
Yes. We retrofit AC-coupled BESS to existing solar arrays and can DC-couple on new-build projects — with EMS integration so PV, storage and site load work as one system.
Yes — we deliver commercial and industrial BESS projects UK-wide with our own installation crews and specialist civils, HV and fire-safety partners.
Share half-hourly consumption, tariff details or just a short brief — we'll come back with a costed proposal and modelled payback within one working week.