LV distribution & switchgear
Main and sub-mains distribution, TP&N boards, MCCB panels, changeover switches and metering — sized to actual load with headroom for future expansion.
From LV switchgear and three-phase power to LED lighting, containment and certification — RNU delivers the full electrical package to warehouses, factories, offices and public-sector sites across the UK.

Designed, installed, tested and certified to BS 7671 — no subcontractor shuffle, one point of accountability.
Main and sub-mains distribution, TP&N boards, MCCB panels, changeover switches and metering — sized to actual load with headroom for future expansion.
New three-phase supplies, dedicated machine circuits, motor isolators, sub-metering and power factor correction for plant, HVAC and production equipment.
Steel tray, basket, ladder, trunking, conduit and busbar — designed and installed to keep site cabling accessible, compliant and future-proof.
Low-energy LED schemes with DALI, presence detection, daylight dimming and emergency lighting — designed to lux levels and CIBSE guidance.
Initial verification, EICR, EIC and minor works certificates, O&M packs and as-built drawings — everything landlords, insurers and building control require.
Consumer unit and DB upgrades, RCD/RCBO retrofits, cable replacements and remedial works from EICR C1/C2 findings — planned around occupied buildings.
From a single circuit to a full site refit, you'll deal with the same engineer from survey to handover.
We walk the site, review existing supplies, load and any landlord or DNO constraints, and agree the deliverables and programme.
Cable schedules, DB and single-line diagrams, lighting layouts and a line-by-line quote — priced against BS 7671 with allowances clearly listed.
Containment, cabling and back-boxes coordinated with other trades. Second-fix accessories, distribution and lighting installed to programme.
Full test schedule, emergency lighting sign-off, snag walk and complete O&M pack with certificates, warranties and as-built drawings.
Every install is verified against the current wiring regulations and handed over with the certification your landlord, insurer and building control expect.
We routinely mobilise UK-wide for these sectors — occupied buildings, out-of-hours and phased works are business as usual.
Send drawings, an EICR, or just a scope note — we'll come back with an itemised quote within one working week.