Fixed-wire testing (EICR)
5-yearly (or interval-based) Electrical Installation Condition Reports to BS 7671 — with prioritised remedial schedules and re-test on completion.
Fixed-wire testing, emergency lighting, PAT, remedials and 24/7 reactive call-out — one PPM contract, one trusted team, all certificates in one portal.

From fixed-wire testing and emergency lighting through PAT and remedials to 24/7 reactive cover — no juggling multiple contractors.
5-yearly (or interval-based) Electrical Installation Condition Reports to BS 7671 — with prioritised remedial schedules and re-test on completion.
Monthly function tests and annual 3-hour duration tests to BS 5266, luminaire replacements, battery packs and logbook maintenance.
Portable appliance testing on a rolling programme — with asset tagging, digital register and fail/repair workflow for office, kitchen and workshop equipment.
Additional sockets, lighting upgrades, board changes, RCBO retrofits and code C1/C2 remedials — carried out by the same team that tests the installation.
Round-the-clock response for power loss, tripping boards, lighting failures and emergency isolations — with agreed response and fix times.
Single online portal for certificates, EICRs, emergency lighting logs and PAT registers — export-ready for insurance, landlord and audit requests.
From day-one audit to a live PPM schedule and a compliance portal your insurer will actually accept.
Full survey of your distribution boards, emergency lighting, small power and fixed appliances — every asset logged, labelled and added to a live maintenance register.
Planned Preventative Maintenance schedule aligned to BS 7671, BS 5266 and PAT intervals — with a clear SLA for reactive call-outs, response times and escalation.
Directly-employed engineers deliver scheduled testing, remedials and reactive repairs — with photographic evidence, sign-off sheets and no subcontractor shuffle.
Digital certificates, EICRs, emergency lighting logbooks and PAT reports delivered to a single portal — audit-ready for insurers, landlords and enforcement bodies.
Commercial and industrial installations are typically tested every 5 years, or on change of tenancy / occupancy. High-risk environments (industrial, wet areas, public buildings) may need shorter intervals — we'll recommend the right frequency after the initial survey.
A typical PPM contract bundles fixed-wire testing (spread annually across your estate), monthly and annual emergency lighting tests, PAT on a rolling schedule, distribution-board inspections and a fixed number of reactive call-outs per year — all priced against a single annual fee.
Yes — contracted clients get 24/7 access to our on-call rota with agreed response times (typically 2 hours for critical faults). We carry stock for common board, RCD and lighting failures so most first-time fixes happen on the same visit.
Absolutely. We audit the existing asset register, certificates and outstanding remedials, then transition your site onto our PPM schedule with no gap in compliance cover — usually inside 2–3 weeks.
Yes — monthly function tests and annual 3-hour duration tests to BS 5266, with digital logbooks, luminaire and battery replacements, and any remedials completed under the same contract.
Every EICR, emergency lighting log, PAT register and remedial certificate is uploaded to a single online portal, so your facilities, HR and insurance teams can pull audit-ready evidence in seconds.
Yes — we deliver planned and reactive electrical maintenance UK-wide across single sites and multi-site estates, with directly-employed engineers and vetted regional partners.
Share your site list, last EICR date or just a short brief — we'll come back with a costed PPM proposal, SLA and mobilisation plan within one working week.