Skip to content
Cat A · Cat B · UK-wide

Office fit-out electricals, on programme.

Cat A and Cat B small power, LED lighting and controls, data containment, floor boxes and comms — delivered around your designer, main contractor and landlord programme.

Modern Cat B office fit-out with LED lighting, floor boxes and small power
What we deliver

One team for the whole fit-out electrical package

From landlord Cat A back-of-house through to branded Cat B floors — designed, installed, tested and certified by the same team.

Cat A small power & lighting

Landlord Cat A small power, LED lighting, emergency lighting, containment and distribution back to the landlord DB — ready for tenant fit-out.

Cat B tenant fit-out

Tenant small power, floor boxes, meeting-room AV supplies, breakout kitchens and tea-points — coordinated with joinery and furniture install.

LED lighting & controls

Architectural LED lighting with DALI / scene controls, daylight and presence detection and emergency systems — designed to CIBSE and lux-modelled.

Data containment & comms

Structured cabling containment, riser coordination and comms-room power — with Cat 6A / fibre install through our data partners where required.

Floor boxes & desk power

Screeded and raised-access floor boxes, undesk power, poke-throughs and cable management — laid out around the final furniture plan.

Testing & certification

BS 7671 EIC / EICR, emergency lighting testing, PAT and full O&M packs handed over for building manager and insurer sign-off.

Our process

Four stages, one point of contact

Priced against your real programme, landlord rules and design — not a spreadsheet guess.

  1. 01

    Brief & site survey

    Walk-round with your PM / designer, existing supply and containment review, and a clear scope split between landlord Cat A and tenant Cat B works.

  2. 02

    Design & coordination

    Small-power, lighting, containment and data design coordinated with M&E, ceilings and joinery — full RAMS, permits and CDM 2015 paperwork before mobilising.

  3. 03

    Install on programme

    First and second fix delivered in phases around ceiling grid, partitions and joinery — with dust, noise and out-of-hours working agreed with building management.

  4. 04

    Test, certify & handover

    BS 7671 EIC, emergency lighting and small-power commissioning, O&M packs and a snag-free handover ready for occupation date.

Where we work

Trusted on corporate, coworking and landlord fit-outs UK-wide

  • Corporate HQ & CAT B
  • Landlord Cat A refurbishment
  • Coworking & serviced offices
  • Tech, media & professional services
NICEIC / BS 7671 compliant
Emergency lighting to BS 5266
CIBSE lux-modelled lighting
CDM 2015 principal contractor
FAQs

Office fit-out electricals, answered

What's the difference between Cat A and Cat B?

Cat A is the landlord's base-build fit — small power, lighting, emergency and containment back to the landlord DB, ready for tenants. Cat B is the tenant's own fit — desks, meeting rooms, breakout areas, AV supplies, kitchens and any branded lighting or feature power. We deliver both, in isolation or as one package.

Can you work in occupied buildings and out of hours?

Yes — most of our office work is in live buildings. We agree noisy / dusty works, isolations and lift bookings with building management, and run night-shift or weekend crews where the programme or landlord rules require it.

Do you coordinate with our designer, main contractor or PM?

Yes. We're used to sitting in a D&B or CM setup alongside architects, M&E consultants, joinery and AV — attending design meetings, marking up drawings and providing BWIC information back to the main contractor.

How do you handle building landlord approvals?

We produce landlord fit-out packs — RAMS, method statements, insurance, isolation forms and CDM 2015 documentation — in the format required by managing agents, and attend pre-start meetings to sign them off.

Can you handle small power, lighting AND data?

Yes. We deliver small power, lighting and containment in-house and integrate structured cabling and comms-room power through our data partners so the tenant sees one accountable team.

What certification do we get at handover?

BS 7671 EIC / minor works certificates, emergency lighting commissioning certificates, PAT records, DALI / lighting-controls commissioning sheets and a full O&M pack — everything the building manager and insurer will ask for.

Do you cover the whole UK?

Yes — we deliver Cat A and Cat B office fit-out electricals UK-wide with our own crews, plus specialist data, AV and lighting partners.

Request a quote

Tell us about your office fit-out

Share drawings, landlord specs or just a short brief — we'll come back with a costed proposal and phased programme within one working week.

Use full quote form